Pune Mayor Orders Detailed Audit of Road Works as Potholes Spread Across City The Bridge Chronicle
Pune

Pune Mayor Orders Detailed Audit of Road Works as Potholes Spread Across City

Mayor Manjusha Nagpure questions repeated road damage despite crores spent on repairs and directs PMC to submit a road-wise report within eight days.

Ankur Nikam

Pune, 14th August 2026: Potholes across the city have prompted Mayor Manjusha Nagpure to question the Pune Municipal Corporation’s road department over the quality and monitoring of road works.

Nagpure held a meeting with municipal officials, including Municipal Commissioner Naval Kishore Ram, to review the condition of city roads.

Join our WhatsApp Channel to Stay Updated!

She questioned why roads continue to deteriorate despite the PMC spending crores of rupees every year on repairs, resurfacing and pothole filling.

She also asked why damaged roads are not being repaired during the Defect Liability Period (DLP), when contractors are responsible for rectifying defects in their work.

During the review, the mayor noted that several roads repaired during 2025-26 have developed problems before their defect liability periods ended. In some locations, the top layer of asphalt has already come off.

The PMC has been directed to provide a detailed report within eight days covering:

  • The amount spent on each road

  • The length of roads repaired or resurfaced

  • The type of work carried out

  • Whether the completed works were geo-tagged

  • The status of defects reported during the liability period

Nagpure also directed the municipal commissioner to take action against officials and contractors if poor-quality work is found.

Nagpure also sought an account of the PMC’s 500-metric-tonne hotmix asphalt plant. She questioned the need for separate tenders for pothole repairs if the municipal plant is already producing asphalt in large quantities. The road department has been asked to provide details of how much asphalt was produced at the plant and where it was used.

According to Nagpure, citizens reported 5,931 potholes in 2025, while 3,230 complaints have been received so far in 2026.

She said the lower number of complaints does not mean officials can wait for citizens to report potholes. Road department officials should identify damaged roads themselves and take corrective action.

The mayor has ordered the PMC to fill all identified potholes across the city within the next eight days.

“Citizens should not have to wait for complaints to be registered. Officials should be able to identify potholes themselves. All potholes in the city have been ordered to be filled within eight days,” Nagpure said.

Join our WhatsApp Channel to Stay Updated!

Help Us Create the Content You Love

Take Survey Now!

Enjoyed reading The Bridge Chronicle?
Your support motivates us to do better. Follow us on Facebook, Instagram, Twitter and Whatsapp to stay updated with the latest stories.
You can also read on the go with our Android and iOS mobile app.

Apple Starts iPhone 18 Pro Production in India for US, Europe

Moscow Engages New Delhi and Multiple Nations in New Arctic Collaboration Push

Travis Kelce Calls ‘Crazy’ Wedding to Taylor Swift the Best Night of His Life

Batwara 1947 review: Sunny Deol and Abhimanyu Singh shine in a deeply sensitive, moving partition drama

Independence Day 2026: S Jaishankar Shares Selfie With Hoisted Tiranga Under Har Ghar Tiranga Campaign

SCROLL FOR NEXT